Today I got the third and final rose ran up, then attached to the cup with the rest using hot knives and wax. Then I painted a layer of shellac over everything, to help the grog to stick to it, and once it was dry I covered it all in first coat grog.
Once that had set we put the plastic cylinder over it all, and I layered scrim (netted fabric) and plaster along the bottom, to seal the cylinder to the board, and around the middle of the cylinder for stability. As soon as this was set I spent the rest of the afternoon mixing and pouring second coat grog, to fill the entire cylinder to make the mould ready for the kiln.
Really proud of my progress today! Got loads done, and worked hard to get the mould ready for the kiln. It doesn’t look like I’ll have a chance to pour before the break, but at least when I get back it will be all ready to go.